Hello; In the reports, a value called "used soil safety stress" is given, apart from the ground safety stress that we entered into the program. What does this value mean? Thanks
Hi, In the reports, a value is given under the name of "used ground safety stress", except for the ground safety stress we entered in the program. What does this value mean? Thanks
Hello, Analysis Settings/Basic -If the "Increase the soil safety stress when using Earthquake Loads" option is checked in the Soil tab, the increased value is printed on the "Soil Safety Stress Used" line.