damlaozgur
New Member
Hello, I made a solution based on the report prepared by the Geotechnical engineer in my ZF ground project, which I worked on. The report also explains in detail that jet grout ground improvement will be done; but the engineer in the building inspection asks me for an extra report, how can I prepare such a soil improvement report even though I am not an expert in geotechnical engineering? Because I've never encountered the same situation before. I don't know if it will be healthy. I would like to get your opinion from my experienced colleagues. Thanks in advance for your attention