The wall load is not defined in the beamless floor. In the last floor K2 beam, there is 7 out of 14 reinforcement in a section, it does not fit into the section. 60 cm to the two-storey building. I think the raft is too much, if it were me, I would always build the foundation and remove the basement curtain from the sides, and the foundation would be buried in the ground. This building is two-storey, but I am against such exposed, superficial foundations in higher buildings. The column heads you put in for punching look just like the beam, even worse than the beam. Idecad does not detail it, but since you take it into account in the calculation, you have to add it to the drawing and it must be manufactured on site. Alternatively, the slab thickness can be increased. Hollow floor can be considered.