slab slab additional reinforcement error

M.sa

New Member
Hello, this problem is not specific to the project, it is a problem we experience in every project. When we select all slab slabs from the 3D Model and click on the flat reinforcement option at the bottom, we obtain the reinforcement drawings that are flat at the bottom in the opening with the upper addition on the supports instead of the pleated. However, instead of adding a single addition to the same support, additional reinforcements are placed in both miter and two adjacent slab openings in lengths. even on some floors, it can sometimes give two flat reinforcement drawings at the bottom. You can create any model and try it. It is not important to delete the ADDITIONAL reinforcements, but this affects our quantities a lot. I've made a request for the type of reinforcement before. It would be more useful in a menu if there was a pileless design option as in the beam or a bottom/upper reinforcement option for the cork. good work
 
"M.sa":3ifyjsfl" said:
Hi I will write, this problem is not specific to the project, it is a problem we experience in every project. When we select all slab floors from the 3D Model and click on the flat reinforcement option at the bottom, we obtain the reinforcement drawings with the upper added opening on the supports instead of the pleated reinforcement. However, instead of adding a single addition to the same support, additional reinforcements are added with both miter and lengths beyond the two adjacent slab openings. In some slabs, sometimes even two flat reinforcement drawings can be given at the bottom. You can create any model and try. It is not important to delete the ADDITIONAL reinforcements, but this situation is very important for our quantities. It affects.
Hello, Can you add a sample project file? Good work
 
Back
Top