Slab additional reinforcements are not visible in the drawing

celikbey

New Member
In the attached file, the Q10 additional reinforcements of the D09 slab on the right on the ground floor, which are visible in the report and in the BA dialog, are not visible in the formwork plan. I would be very happy if you could buy a new plan and try it and tell me the solution. Have a nice day...
 
The D09 tile is adjacent to the D10... The upper left addition of the D10 tile appears as fi8/18. That's why it is drawn as additional fi8/18 in the pattern plan. Get the formwork plan by arranging the upper left addition of the horizontal axis no. 1 of the D10 slab as fi10/18. Note: In the D09 slab, it would be appropriate to arrange the upper right addition of the calculation axis no. 1 in the horizontal direction as fi10/18. Good work
 
Back
Top