"Levent Özpak":1vqizbl9" said:
Hi, In the project "F BLOK 19052020.ide10", one of the projects you added, there is a moment jump at the intersection of the P32 curtain and S03 column. In the Analysis/Settings/Foundation Soil tab, select the "flat connection" method in the Raft Foundation-superstructure interaction section. Note: You can define a single raft foundation in the project and edit the reinforcement axles and working distances separately for long and short sides. (example.cde) Good work
Thank you for your interest. If you have noticed, the minimum reinforcement spacing of the raft was 13 cm in the project without the add-on, but it decreased to 8 cm in the add-on condition. If I could make the reinforcement spacing at least 10 cm without making the reinforcement diameter fi18, it would have been easier for me to get municipality approval. At the moment, I can't think of a solution other than dilation. Do you have an idea about this?