Screen ratio error after analysis

Re: curtain ratio error after analysis urgent help Hello, when the calculation is done: K114 beam of the 9th floor gives an error because the joint point is fixed in the beam. When the nodal fixing is removed and the reinforced concrete calculation is made, there is no error. NOTE: WHEN MAKING ACCOUNT IN THE NEW PROJECT, DO NOT CALCULATED BY FIXING THE NODE POINTS. Take it easy Unver ÖZCAN
 
Re: curtain ratio error after analysis urgent help First of all, I would like to thank you brother Ünver, you are like Hızır :)tmm brother, I will pay attention Brother, there is no problem in getting analysis, the report is correct, there is no problem in geometry control, but; After receiving the report, it checks the screen ratio, it gives an error with a red tick mark, ünver brother, I encountered it for the first time, I would be glad if you could help me.
 
Re: screen ratio error after analysis urgent help Hello, Remove Screen ratio report before importing optional reports. The curtain ratio report is a check on tunnel formwork systems.
 
Back
Top