Hello. I'm drawing scaffolding for the project in the link, analysis time takes a very long time. Half an hour later, it still says "Starting analysis". In v8, there were contractions depending on the size of the project, but I did not encounter such a situation in any of them. It will be my first scaffolding experience in v10. I would be very pleased if someone can look at the link and tell me what the problem is.. Take it easy... Scaffolding will be built on 4 fronts)
You do not have permission to view link Log in or register now.
 
Hello there; You can get the drawing and scaffolding report of your project from the link
You do not have permission to view link Log in or register now.
. As stated in other titles before, you do not need to model from all 4 sides during the analysis. Make data entry, analyze, design and get a report on the facade that will cause an unfavorable result. Then enter all facades for drawings and get drawings. It is the drawing of the pier located on all the facades that the municipalities want to see. Good work.
 
"nurgulkaya":22hv5hwd" said:
Hello;
You do not have permission to view link Log in or register now.
the drawing of your project and the scaffolding report As stated in other titles before, you do not need to model from 4 sides during the analysis. Enter data on the façade that will cause unfavorable results, analyze, design and get a report. Then enter all the façades for drawings and get drawings. Good work.
Thank you very much, Nurgül lady.. I have tried that method many times before; it was taking a long time to analyze each front separately, although I drew it on only one front in this project. 30 min. I waited, although there are few scaffolds, it waited in the "starting analysis" section. However, there is no problem with the file you sent. Thank you very much..
 