ribbed flooring

semihguner

New Member
HELLO, I SENT YOU A PROJECT AND A PICTURE. I WANT TO DESIGN THE PROJECT LIKE THE PICTURE. SO, WHEN 40 CM OF THE RIBBON FACES TO THE OUTER FACE, I MUST MANUALLY TURN THE BEAM AT THE END PART (EVEN TURNING IT IS NOT 20 CM, IT FAILS)
 
"semihguner":2hapezbr" said:
HELLO I SENT YOU A PROJECT AND ONE PICTURE I WANT TO DESIGN THE PROJECT LIKE THE PICTURE. SO WHEN NRVURE ARRIVES TO THE 40 CM PART OUTSIDE SURFACE, THREE PARTICLES OF EMERGENCY CENTER CM DOESN'T GIVE ERROR)
Those beams are the elements of rib flooring system. You didn't specify what kind of error occurred. You can ignore the dimension condition warnings you call error.
 