Reinforcement on curtain not beating properly

-Combine P56 and P61 curtains with the Combine command. -There is a problem because this curtain is stuck on the edge of the head part of the P12 system curtain. You can get a drawing by giving 1 cm offset to the curtain you have combined. When you give offset, move the K18 beam joint point onto the curtain or the P12 curtain head area length becomes 86cm. If you manually make the heading area 90 cm, there is no problem in drawings. My other suggestions -A separate floor was opened for the elevator well. I suggest you delete this floor and give the elevator shaft details as described in the forum.
You do not have permission to view link Log in or register now.
-I recommend that you completely separate the single-storey part from your project with dilatation.
 
Thank you Mr. Yasin, will it be a problem if I make the elevator floor like this? I usually draw elevator pits this way and place them in the basic application map.
 
Do not open a floor for the elevator shaft. Model the foundation flat and detail the pit with the same thickness and reinforcement as the foundation as described in the Forum. Including it in the model can create connection problems between the main foundation and the foundations you model for the elevator pit, especially in superstructure interactive models
You do not have permission to view link Log in or register now.
 