Hello. While trying to analyze risky buildings, I want the corrosiveness of the columns to be reflected in the analysis, but I don't know how and how to do this in the program. I'm still learning, but I try to learn the project and analysis on my own as much as I can. For example; Do I need to set this factor to 0.9 on a column with 10% corrosion? Or do I need to do 0.10? When I look at the analysis results, the number of risky elements increases as the value decreases. I would be glad if you inform me about this.
 
"MaryleneFa":2xytnr2s" said:
Hi there. While I am trying to analyze risky buildings, I want the corrosiveness of the columns to be reflected in the analysis, but I do not know how and how to do this in the program. I am still studying, but I am trying to learn the project and analysis on my own as much as I can. For example ; Do I need to make this factor 0.9 in a column with 10% corrosion? Or do I need to make it 0.10? When I look at the analysis results, the number of risky elements increases as the value decreases. I would appreciate it if you could inform me about this.
Hello, 10% in Reinforcements In case of corrosion, the corrosion multiplier should be entered as 0.9.
 
Back
Top