Hello, There was basically no stapling problem in a project I was working on. Now there is a stapling problem in the account reports I receive. Do we need to check the projects we did before the update?
 
Hi, in Ver 10.20 version, stapling controls, stapling reinforcement calculations and reports were made within the scope of 2018 Earthquake Regulation. (This was stated in the Ver 10.17 regulatory compliance document.) It would be appropriate to make stapling problems recoverable. You can review the work done in Ver 10.20 from the link below.
You do not have permission to view link Log in or register now.
Good work
 
Hello, In the studies carried out at 10.20, "Punching controls, punching reinforcement calculations and reports were made within the scope of the Earthquake Regulation." he is writing. How and where the punching reinforcement is added and calculated. Thanks, good work.
 
"smsenturk":ia862d5k" said:
Hello, in the work done on 10.20, it says "stapling checks, stapling reinforcement calculations and reports were made within the scope of Earthquake Regulations." How and where is the punching reinforcement added and calculated. Thanks, good work.[
"smsenturk":ia862d5k" said:
/quote] Hello, the properties of the column or the wall to be used for the punching reinforcement are entered. The type of punching reinforcement to be used is selected in the punching equipment tab. The drawings of the selected punching reinforcement are not made automatically in v10.20. You can also review the following title on this subject.
You do not have permission to view link Log in or register now.
Good work
 
Good day, I noticed that in my reinforced concrete project, stapling control is done for only 2 columns. Why is this check not done in my other columns?
 
"albayrakozgun":pesk8rs6" said:
Good afternoon, I noticed that in my reinforced concrete project, stapling control is made for only 2 columns. Why is this check not performed in my other columns?
Hello, stapling control is not performed in the columns connected to the basement/basin curtain and is not shown in the reports. If there is a different situation in your project, please attach the project file.
 