RADIA BASIC REINFORCEMENT PROBLEM

MühendisKUTLU

New Member
In one of my projects, I basically determined the calculation axes myself. 6 calculation axes. After I made my basic calculation, he made a reinforcement drawing for each calculation axis in the drawing I took. Everything is normal until here. When I looked at the total reinforcement, 600 tons of iron were found. Later, I deleted the calculation axes and used a single calculation axis. I made an account. This time, the quantities turned out to be 450 tons of iron! thanks...
 
You may not have edited the Valid Distance of the reinforcement axes with the Reinforced Concrete Calculation axis edit command.
 
Back
Top