Pier Report

celikus

New Member
When we draw a scaffolding project with scaffolding maxro, both the data reaches very high dimensions, the program shrinks excessively and the report is printed close to 800 pages, is this normal? I'm talking about a medium size building with a 300 m2 deck for 8 floors.
 
Hello there; The reason for the high number of data and reports is the stairs of the scaffolding, etc. There are design results of even the smallest parts such as, and when you look at it, there are many elements in the details in the scaffold. For this reason, it is normal for the program to slow down and the data and reports to be high if scaffolding is entered on 4 sides of an 8-storey building. However, if you can send your project, let's examine it, if there is a way to reduce the amount of data and report, we will inform you again. Good work.
 
Well, if the façades are the same, would we make the right approach if we modeled by building scaffolding on 2 fronts instead of 4 sides, at least if we take the calculations that way
 
Hello there; If the facades are exactly the same, it will be sufficient to model 2 facades. In the different case, the method generally used to get the calculation results of the front that will give the most unfavorable result will shorten the report. If you wish, you may not print the detailed wind report as a part of the optional report. Good work.
 
"nurgulkaya":3k6qv1j4" said:
Hello; If the facades are exactly the same, it will be sufficient to model 2 facades. In the case of a different situation, getting the calculation results of the facade that will give the most unfavorable result, the generally used method will shorten the report. If you wish, the detailed wind report can be a part of the optional report. Good work.
Thank you. Good work
 