About the progressive construction calculation method? In the pdf about the progressive construction calculation in the forum, the phased construction calculation is called especially in high-rise buildings, and in the regulations it is called high-rise with 10 floors and above. Should it be used in building designs of 1-10 floors and above, or can it be used on 5 or more? 2-Construction time, on 250-300 m2 deck, the average mold time is 4-5 days. If this value is entered as 10 days or 20 days, does it make much difference in the account between 10 and 20? 3- If this option is checked, should it be selected as full or semi-rigid? (it is connected to the building carrier system, but can it be used in both) thanks.