Phased construction calculation

hello, raft foundation reinforcements are different between the phased and non-staged construction calculations in the projects I have done. Is it possible to open the phased construction account a little bit?
 
Hello, If you are making a superstructure-based interactive solution, it is normal for the raft calculation to change since there will be a difference in the element end forces with and without gradual construction calculation. The attached documents will help you.
 
About the progressive construction calculation method? In the pdf about the progressive construction calculation in the forum, the phased construction calculation is called especially in high-rise buildings, and in the regulations it is called high-rise with 10 floors and above. Should it be used in building designs of 1-10 floors and above, or can it be used on 5 or more? 2-Construction time, on 250-300 m2 deck, the average mold time is 4-5 days. If this value is entered as 10 days or 20 days, does it make much difference in the account between 10 and 20? 3- If this option is checked, should it be selected as full or semi-rigid? (it is connected to the building carrier system, but can it be used in both) thanks.
 
Back
Top