friends, when I do a performance analysis, even though the cut is 20 percent, controlled damage occurs.
 
It is not very clear from the photo, but there are other inconsistencies in this report output, could it have been manipulated? Even if you put the shear forces aside and look at the building performance evaluation part, the performance should be limited damage, not controlled damage. (Both criteria in the first table seem to be met). However, at the bottom, he said controlled damage.
 
"rcp52":eee2nj8o" said:
friends, when I do performance analysis, even though the cut-off is 20 percent, controlled damage occurs. I wonder if I'm interpreting it wrong, can you help with this
Hello, Can you add the project file? Good work.
 
In fact, I work as an engineer in an administration, so a project came to me, I suspected it was being tampered with, I asked you if I misunderstood...
 