not constantly saving foundation beams

izmirlimuhendis

New Member
When I analyze the project, I see that the foundation beams give a red Ace warning, but when I want to get a report and examine it, it does not give any errors in the report. I think there is a problem with stir-fries, but when I look at the report, I see that there is enough stir-fry area, where is the problem?
 
There is a shortage of Stirrup in the project. In the Continuous Basic parameters, the minimum B value for double stirrups is 80 cm. The problem of lack of stirrups can be overcome by arranging this value as 70 cm and arranging double stirrups on the foundations.
 
"izmirlimuhendis":3cf1ez7f" said:
when I analyze the project, I see that the foundation beams give a red Ace warning, but when I try to get a report and examine it, it does not give any errors in the report. I think there is a problem with stirrups, but when I look at the report, I see that the stirrup area is enough, I wonder where is the problem? ?
Hello, The program constantly reports the lack of reinforcement in the foundations during the report with the reinforced concrete dialog. As you stated, the lack of reinforcement is caused by stirrups. In the selection of reinforcement, sufficient stirrups cannot be selected because you do not allow the program to use more than a certain diameter. For continuous foundation, the program can use increase the diameter of stirrups or you can make a double stirrup arrangement as Levent Bey wrote.
 
have a nice day. In the attached project, I think the stirrup was laid by using 3 each, I think I want to make 2 and make the used iron 10, but I don't know how
 
Hello. My suggestion -- To make a raft between the foundation beams and put a column or a curtain on the raft slab is against the program logic. . --I turned two of the ribs. Take it easy Unver ÖZCAN The project is attached.
 
"batuhann28522":1jen7lao" said:
Good afternoon. In the attached project, 3 stirrups were used as a continuous basis, I think I would like to do 2 and make 10 pieces of iron used, but I don't know how to do it
Number of stirrups in continuous foundation Reinforced Concrete/Parameters/Continuous In the Basic Parameters dialog, "Min. B" line, reinforcement diameter can be intervened in the Reinforced Concrete/Reinforcement Selection dialog. However, in the version of the basic system you are using, the program is incorrect in terms of data entry...
You do not have permission to view link Log in or register now.
 
Back
Top