Teachers, I would like to share with you a few of my problems. 1- More than 1 rigid diaphragm was detected during the analysis. If I solve this with a single rigid diaphragm in the floors, what kind of inconveniences will it cause. 2-After the analysis, there is a weak floor with ni<60 in the report. There is a warning to increase the system rigidity. But the building I do not understand is B+Ground+5, that is, 7 floors. It gave this error in the basement, 1st floor and 3rd floor. (ground floor height is 4.00m Although he did not give this problem here) If I get the answer to these two questions, it will be very appreciated and I will learn the solution of these <60 questions