Mosque cassette flooring HELP

volkan-1980

New Member
FRIENDS, I WORKED ON CASSETTE FLOORING FOR THE FIRST TIME. FRIENDS WITH CASE FLOOR EXPERIENCE DO NOT MISS YOUR COMMENTS AND OPINIONS THANK YOU VERY MUCH IN ADVANCE...
 
Hi My Suggestions: --Enter the live loads on the mahvil floor ceiling --Why are there wall loads on the beams in the mahvil floor ceiling? --If you are going to take the live loads on the beams on the mahvil floor ceiling, you should get a load of 0.15*0.4=0.06 t/m. --Enter the stair load --Correct the iron lengths on the tape more than 12 m by staggering. Take it easy Ünver ÖZCAN
 
Unver, first of all, thank you for your comment. * Since the roof will sit on the mahvil floor ceiling, I did not enter a live load. *I missed the loads on the mahvil floor ceiling beams, I rearranged them and entered 0. *I entered the stair load as 1 tf/m2 live load on the beams around the stairs. Is it missing or wrong? *As you said, the length of the reinforcement exceeds 12 meters. When I get the beam extension, I will manually arrange the reinforcement overlays in 2 dimensions. Do you think it would be economical to carry the roof on the cassette floor and the wooden ceiling covering from the bottom? Do you have any suggestions about the design?
 
Back
Top