In the following project; The alpha S is 0.30, in the X direction, and 0.08 in the Y direction. How can I increase this ratio above 0.40 most economically? I get the rigid basement floor number -2, can I get -1 because the basement is not rigid? How can we call it rigid? In order to say how much of it should be surrounded by curtains, to be able to say rigid... Shall I surround the basement of the building with curtains and make the upper rigid basement floor number -1. Or should I add curtains continuing on all floors and get the upper rigid basement floor number -2? How can I solve the 1st degree earthquake zone structure, else Ductile, Normal etc... What should be the R coefficient for this project under these conditions?