hello, after the analysis in my project, I cannot fix the errors in the screenshot below. I have looked at the topics in the forum about these errors, but I cannot fix these errors, especially the errors in the foundation reinforcement and the 2 curtains in the basement. can you help please the link of my project is below
You do not have permission to view link Log in or register now.
 
Re: IN MY PROJECT, foundation, curtain reinforcement and beam maximum pursan Hi My Suggestions: --Do not use DS while making a new project. Remove the curtains, --1. Since the basement floor is a curtain wall, activate the X and Y direction ticks from the floor general settings, -- Correct the errors in the geometry control, -- There is an incorrect intersection of S703 and K720 on the 6th floor, delete the beam and re-enter it, --Increase the raft reinforcement, --In the basement floor increase the stirrup of the elevator curtains, --There are beams that do not save deflection on almost all floors. These low-height beams are stuck with high-height beams. A wrong solution, which is rarely done in practice but not suitable, should be the opposite, --The cross-section and/or concrete value should be increased considering the architectural project in overcoming deflection and deviation. --Check the beam wall loads, --If there is a wall on the rib slabs, the live load increase, --Stairs' support to beam should be as K58 is supported in basement. The other K59 supported ladder should be extended to the beam by extending one corner of the person, and the stairs should be straightened on the other floors, (6th floor) --1. At the K23-K46 intersection on the floor, a column can be placed from the bottom up or the K46 beam can be turned into a curtain, -- (b) errors in the columns should be corrected. I edited part of the project. The project is attached. Ünver ÖZCAN
You do not have permission to view link Log in or register now.
 
Re: In my PROJECT, basic, curtain reinforcement and beam maximum pursan thank you for your answer, thank you
"unver":kualmstd" said:
--Don't use DS when making a new project. Remove curtains by saying
i didn't understand what you mean
 
Re: In my PROJECT, do not make calculations by ticking the reinforcement fixing (DS) check before calculating the reinforcement in slab, column, beam, curtain, raft, continuous foundation.
 
Re: In my PROJECT, foundation, curtain reinforcement and beam maximum pursan
"unver":1800u2p2" said:
Slab, Column, beam, curtain, raft, reinforcement fixation (DS) pre-calculation of reinforcement in continuous foundation Don't make an account by ticking.
thank you very much
 