Max pursantage error and R coefficient problem on my curtain

semih5252

New Member
I have a problem with the max ratio error on my k27 beam and the R coefficient on my curtain, how can I solve the system, what changes can I make, I would be glad if you could help. I don't have much chance to move because of the architectural design.
 
Re: pursantaj problem If the beams droop 25/50 in the area where the k27 beam is located, the problem is solved. There are only problems with the basement curtain. P1,2,3 curtains need to be combined. Also, the basement curtains must be sub-floor / mark the icon that does not continue on the upper floors. In the analysis settings, you can make the R floor number 7 analysis.
 
Re: pursantaj problem Unfortunately, teeth are not required on the shop floor because the ground floor is a shop.. I wonder how we can overcome it otherwise..?
 
Re: pursantaj problem I recommend that you reconsider the carrier system. You can solve the problem by connecting the beams to each other according to the current situation on the hollow floor floor. (already the ceiling is flat, you can easily pass beams wherever you want to connect the columns). But I don't know what kind of design you can go for in the sections I have marked on the other floors.
 
first of all, good evening, this is how I solved the problem of the hollow floor in my project, but I had some problems with the placement of columns and beams due to the architect. When I made the final analysis, I had a problem with the floor of the engine room and the ground floor, how can I overcome this problem.
 
Back
Top