As far as I can see in the report in the scaffolding macro, the live load is 0.1 t/m2. Is it possible to change it? The municipality also requested 0.2 t/m2, but as stated in Article 6.2.4 of TS EN 12811-1, is it necessary to take the situation where a uniformly distributed load of 1 kN/m2 acts, or did they ask for 0.2 t/m2 based on another article in the regulation? Thanks in advance for