Linear performance analysis before collapse

mahmudkayra

New Member
FRIENDS, THE PROJECT WAS DRAWN IN 2004 AND NOW I HAVE TO DO A PERFORMANCE ANALYSIS. I ENTERED THE SYSTEM AND ADDED THE VALUES GIVEN BY THE LABORATORY TO THE SYSTEM AND ANALYZED. THE TARGETED LEVEL OF LIFE SAFETY BUT THE ANALYSIS RESULT GIVES BEFORE MIGRATION. THE PROJECT IS ATTACHED. IS THERE A SITUATION I MADE WRONG OR IS AN OPTION I NEED TO CHANGE LIFE SAFETY. THANK YOU IN ADVANCE FOR YOUR HELP.
 
Back
Top