Laying parameter

erdalkykc

New Member
HELLO THERE; After analyzing, the floor mat donato intervals are always 8 to 18 intervals as in the picture.. I want to increase this interval to 30-35 intervals.. Is there any parameter we can correct for this, or we do it manually one by one!
 
Enter the slab command / select the Reinforced concrete calculation axis edit command / select bottom + top flat reinforcement from the dialog menu / reinforcement type section.
 
With the option you mentioned, reinforcement is placed at the bottom and top. In my opinion, as in the pile + flat option, it should be placed as a cap reinforcement on the supports and as a bottom reinforcement on the opening, without adding the pile. It would be more elegant if it was done by the program, without making changes in the reinforced concrete tab.
 