The project has no chance to stay on the unsafe side. On the contrary, many things are exaggerated. I think the column sections are large. Concrete quality is high. The beam sections are sufficient. The beam loads are exaggerated, the slab thicknesses are sufficient. , Frame continuity is good, Axles are smooth, What else
A little bit of everything is wasted. Iron is too much, concrete is too much, and the cost is high due to quality. Only the p1 curtain stands in a meaningless place. No beams are attached to it in the vertical direction and it The connected beams became studs. And the k51 beam became a cantilever from the beam.