Karmnl1158
New Member
friends urgentllllll
Erase the slab edges on the break line, put a beam, create a slab, no problem. How can I tell from the structure tree.[/quote] You can examine the raft laying results from the structure tree by activating it."Karmnl1158":9505alor" said:Again, in my 3rd floor inclined floor, my floor thickness is insufficient, although I add stud beams, 15 cm floor thickness is insufficient existing in the project abi