Is cascade structure safe?

kursatyigit

New Member
Hello, I am a recent graduate, I have a villa project and the land is sloping. In the continuation of the building, a low-level car park is also requested. I modeled the project as desired, but the underground parking part confuses me a bit. I also made earth pressure loads in line with the information I found in the forum, but I feel like the reinforcement of the P1 curtain is very weak. I have attached the project, I would be very happy if anyone can review and return.
 
Re: Is Gradual Building Transport safe? Hello, In the model as it is now, the elements in the 1st basement floor and the elements in the ground floor cannot be solved together. The continuous foundations you define on the curtain are not attached to the lower floor curtain. If you want to solve it interactively, create a foundation with a raft foundation on the ground floor and define the raft edge on the P1 curtain to be in the middle axis of the curtain. You can review the sample definition from the attached project. Some notes about the project: -Define the joint points of the beams connected to the curtains in the rigid direction to be compatible with the wall joint points. With its name on the ground floor, the nodal point of the K49 beam is modeled above and outside the P27 curtain. Enter data by adjusting the beam offset from the joint of the P27 beam. - The structure is a single-direction threaded (hollow-hole) floor structure and serious sanctions were brought in TBDY 2018 regarding hollow floor floors. Related TBDY 2018 Articles 4.3.4.3, 4.3.4.6 and 4.3.4.7 and Prof. Dr. You can also examine M. Nuray Aydınoğlu's statement on the subject. We recommend that you design your project as a plaque system. -The tile type is incorrectly selected in the analysis settings wizard. Single-direction threaded (hollow-hole) flooring should be selected. -TK01 base not connecting to P27 curtain. It would be appropriate to click on the node of the P27 curtain and enter it in two parts. -TK05 base not connecting to P29 curtain. When defining a continuous foundation in the rigid direction of the curtain wall, it is appropriate to create a foundation piece by clicking the end joints of the curtain wall so that it remains under the curtain. This applies to the TK08 and P27. Arrange it so that the left node of the TK02 foundation lies outside the S04 column, within the defined Column boundaries. -To connect TK11 to P27, define the left node from the node of the P27 curtain. - If there is a floor curtain in the final analysis, we recommend that the raft foundation finite element widths are reduced (for example, 25 cm) and analyzed. Good work.
 
I returned a little late, I'm trying to fix the deficiencies in the structure. I separated the garage part, I will calculate it in a separate file. Thank you so much. Sent from my Mi Note 3 using Tapatalk
 
Back
Top