eissenhover
New Member
hello everyone. I had an urgent question. The contractor company brought a project for the flagpole foundation. When I drew and analyzed the project with the same cross-sections, my iron quantity was doubled as the incoming project. After the analysis, when I enter the column menu from the reinforced concrete section of the program, change the radial foundation reinforcement manually while Q16/12 is in the middle, and make Q16/22, the color immediately turns red and (As-) is written in parentheses. he also says that the equipment area is sufficient, there is no problem until here. However, when I want to get the raft basic report, it gives a warning in the first window because of insufficient reinforcement, when I click OK and continue, all verifications are provided. If the reinforcement area is insufficient, how can all the verifications be "green tick" as well as positive? I am attaching the project as well. project information; ***there is a square raft with 410 cm on each side and a height of 85 cm ***there is a square column with a side length of 160 cm and a height of 155 cm in the middle of the raft ***a 5000 kg flagpole on top of the square column sitting. The anchor of the flagpole extends into the foundation. *** I have adjusted the concrete class to be c20, raft bars Q16, column bars Q20, stirrups Q8, ground floor 15000 kg/m2. These are the features of the project that came to me. Could you take a look at the 5000 kg flagpole installation I made to the column, I wonder if I'm wrong there. The quantity of the incoming project is basically a value like Q16/22 in both directions at the top and bottom. so in total 72Q16 is double in my report. Am I making a mistake, is it too late for a project Q16/12, I don't understand?