Insufficient reinforcement in beamed raft foundation error

clskntugce

New Member
I used rafter raft foundation in my project. I get the error of insufficient reinforcement for only 1 raft laying, the other parts provide. I couldn't solve the problem. How can I fix the error. I will be glad if you help
 
Hello My Suggestions -- There is an insufficient number of dynamic modes error in the general report of the earthquake regulation. --In this case there seems to be an error in the raft alone. -- If the number of mods is increased, that is, if this stage is passed in the account, I think there will be more errors. --foundation beams are faulty, they overlap if you make ampathes on the foundation beam and make a raft foundation next to it. --The columns are not seated on the raft beam as in the 4 axles where the raft beam has passed by the column. --The basis of the curtains, which I think is the elevator, is faulty. --Won't the elevator curtain be hollow on the floor? --I think there is a ladder around it, but the ladder is wrong with such a model. --There are a lot of short beams, and when the number of mods is increased and the calculation is made, there is a high probability of problems here. --Concrete C45 is a separate problem in providing this concrete. I suggest you make a raft without beams for a 25-storey building foundation. --Why are the floors 20 cm? increased the weight a lot. It would be appropriate to reduce it. --It should be essential to create a frame in the building, why did you make a short console in front of the halls? The columns can be brought forward a little to form a frame. --Addition of 4 curtains of 527 cm, which are not connected to the beams outside the building. Do what I say, let's see if it balances out. Unver ÖZCAN
 
The short consoles I made in front of the halls were drawn as protrusions in the architectural plan. For that reason, I could not make columns or curtains for those parts. Apart from these, the only part where I can throw curtains around the building is the 527 cm curtains. There are overhangs or glass in the other parts. I did it to increase the rigidity. If you have any suggestions on how I can do otherwise, I would be glad. In fact, I went to increase the thickness of the slab because there were parts where I got a tile error. I tried a raft without beams for the foundation, but I couldn't provide the foundation, but I got a beam error on the upper floors. I had to increase the height of the raft foundation too much and go outside the building too much. How can there be another solution? I thought that I could reduce the stress by increasing the foundation in this way and spreading the load of the building to more area by making amputations. However, in this way, I got a raft error. I've been trying to fix the underlying problem for a long time. How many times would I be better off using the concrete class? I will try your suggestions by increasing the number of mods. Thank you very much again
 
Back
Top