I had two slabs with slab deflection limit, I increased the thickness, I made an analysis, 6 slabs came out, is the warning that the deflection exceeded the limit is ridiculous????
I had two floors with floor deflection limit, I increased the thickness I made an analysis, 6 slabs came out, isn't the warning that the deflection exceeded the limit is ridiculous????