T tahamus28 New Member Dec 30, 2019 #1 AT THE FIRST STAGE, THE CEILING ON THE RIGHT SIDE WAS NOT FLOORING, THERE WAS RENOVATED AND THE FLOORING WAS ADDED, BUT CONTINUOUSLY THE FOUNDATION IS INSUFFICIENT ERROR THANKS...
AT THE FIRST STAGE, THE CEILING ON THE RIGHT SIDE WAS NOT FLOORING, THERE WAS RENOVATED AND THE FLOORING WAS ADDED, BUT CONTINUOUSLY THE FOUNDATION IS INSUFFICIENT ERROR THANKS...