Hello, the control engineer of the municipality I am affiliated with does not accept my system shown in the picture. Since the moment will be high at the midpoint of the beams (K29-K32), let's not make studs at the middle point, let's divide the columns by 9. He wants to have double studs like K37-K15. I would like to get your opinion on this matter.