I have a few questions Radye basic , report and sheet articles

a_kahveci

New Member
1 - How much and how does the diameter of the raft foundation stand reinforcement affect the foundation strength? 2 - Concrete reinforcement etc. in the report. Doesn't it show the meter? 3 - The dimensions of the overlapping texts on the sheet, etc. Is there a more partisan method when smashing and fixing with M? they overlap too much even with drawing optimization turned on.
 
Re: I have a few questions..
"a_kahveci":2u2z0sys" said:
1 - How much and how does the diameter of the raft foundation stand reinforcement affect the foundation strength? 2 - Does the report not show the concrete reinforcement etc. quantities? 3 - Is there a more partial method when correcting the overlapping texts on the sheet with dimensions etc. M? Even if the drawing optimization is turned on, they overlap too much.
1-Table only to hold the upper reinforcement, 2-For quantity, select the report option from the report option 3 By typing -m enter, texts and accessories can be easily edited.
 
Re: I have a few questions.. 1 - Choosing a different diameter in the tripod reinforcement definitely affects the components, but I wonder how it affects them, and how we will choose the diameter. 2 - I know there is quantity in the report tab, but it is one of the optional reports. We are getting a printout and we can't see the quantity in the printout? This is what I want to ask.. 3 - I know how to cut and correct with M and drawing optimization supposedly makes the job easier, but again, especially the mold plans are very complicated, many reinforcement and length information are not where they should be. There are too many overlaps, I was wondering if there are different things in the style of hand practice.
 
Re: I have a few questions..
"a_kahveci":2c1c7kxq" said:
3 - I know how to break it down and fix it with M and the drawing optimization supposedly makes the job easier, but again, especially the mold plans are very complicated, many reinforcement and length information It's not where it should be. There is a lot of overlapping, I was wondering if there are different things in the style of hand practice.
The program creates the reinforced concrete calculation axis based on the middle of the slabs.In continuous slabs with the same height, the reinforcements and the measurement lines will be formed along a line. However, in continuous slabs with different heights, the reinforcements will not be along a line. Enter their calculation axes yourself continuously. Thus, you will encounter relatively less interference as the dimension line and reinforcement texts will be drawn on the same line. In narrow areas, unfortunately, due to the nature of the work, more interference For this, the M key provides convenience.
 
Re: I have a few questions..
"a_kahveci":1qqsq416" said:
1 - Choosing a different diameter in the coffee table reinforcement definitely affects the pieces, but I wonder how it affects them and how we will choose the diameter.. 2 - I know there is quantity in the report tab, but we take printouts from optional reports and can't we see the quantity in the output, this is what I want to ask.. 3 - I know how to cut and correct with M and drawing optimization makes the job easier, but again, especially the mold plans are very complicated, there are many reinforcement and length information There are too many overlaps. I was wondering if there are different things in the style of hand practice.
When you say I'm smashing and correcting with m, you don't need to break apart the blocks, you can just say m enter and hold one of the overlapping text and edit as you wish.
 
Re: I have a few questions..
"a_kahveci":3u0h6q57" said:
1 - Choosing a different diameter in the coffee table reinforcement definitely affects the components, but I wonder how it affects them and how we will choose the diameter...
Hello, The diameter of the trestle reinforcement increases in proportion to the height of the foundation. You will determine it completely by taking into account the buckling of the reinforcement. This is something that does not need to be taken into account. For example, the Q14 trestle reinforcement up to 80 cm foundation, while walking on it and while installing the upper reinforcement It will be enough. But at a height of 120 cm, you will be slender and increase the diameter. Of course, you can find a solution by increasing the number of m2, but it is usually 1 piece / m2. With the application of the lower and upper reinforcement to the table reinforcement, the tripod reinforcement can be taken into account in the basic cutting calculation, just like stirrups. It is not preferred because it is not known and difficult to implement.
 
I got enough answers to questions 1 and 3, thank you...2. It seems that the quantity in the question does not appear in the printed report.
 
"a_kahveci":2ef2dc42" said:
I got enough answers to questions 1 and 3, thanks... In question 2, the quantity is probably not found in the printed report..
Quantities are presented as a separate report. You can import the quantities and add them to other reports.After receiving the report, it is possible to start the report and the index from the page number you want with Image/Page number Settings.
 