I get a warning that the beam deflection limit has been exceeded.

SonDurak

New Member
IN THE ATTACHED PICTURE K136 BEAM HAS "BEAM DEPLOY LIMIT EXCEEDED" ERROR, DO YOU HAVE ANY SUGGESTIONS OTHER THAN TO INCREASE THE DIMENSIONS (DUE TO TIME DEPENDING)? (I CAN'T ADD THE PROJECT DUE TO ITS SIZE.) THANKS..
 
You must enter the hollow blocks one-way. If you enter a cassette while calculating, it will load the transverse tooth like a beam and transfer the load to the k136 beam. You can best understand this by comparing the loads on the beams after unidirectional and bidirectional analysis. When transverse threads need to be placed constructively when the span exceeds 4 m. I put it in the drawings and I put the typical detail so that the size and reinforcement will be the same as the rib. Don't want to get involved in your business, you need to enter the p04 curtain on the elevator L curtain as a column and you need to meet the width/length: 1/7 condition. Sent from my iPhone using Tapatalk
 
Although the height of the hollow block is 35 cm, the K710 beam is 40 cm and the K710 is the butt beam. Sent from my iPhone using Tapatalk
 
Back
Top