Hello If you take at least 31 cm between the beams of K17-K12 on the ground floor, it draws. Unver ÖZCAN
 
I mentioned above, could it be related to the distance? As you said, drawing is taken at a certain distance, but I need to get a drawing in its current form.
 
Hello, The opening of the rib flooring you mentioned is 25 cm. You want to expand for a 25 cm long element. In the program, no opening is arranged for rib slabs with less than 40 cm opening and cassette slabs with less than 50 cm opening.
 
"HakanŞahin":1w9aor0w" said:
Hi, The rib slabs you mentioned have a 25 cm opening. It is not edited.
When I made the 25 cm aperture 32.5, I got the jig and arranged the distance according to 25 cm :)
 
"mkrts88":1mdcih80" said:
social engineering example
my brother, because I couldn't find a solution to my problem, I asked it here, if you know, write an answer, tell me the solution, let's apply it, you will be an engineer beneficial for the environment
 
my comment is positive. If you look at my previous comment, I suggested the same solution, I think you misunderstood me.
 
"mkrts88":1aakauwf" said:
my comment has a positive meaning. If you look at my previous comment, I suggested the same solution, I think you misunderstood me
sorry bro, I wrote with a momentary limit :) sorry
 