I have a project with hollow floor tiles. I have 60 by 32 beams. the building control told me to fix the b errors, but I fix the errors on one floor, different errors appear on the other floor, I can't fix it. When you move it too much, this time the beam gives an error. It took a lot of work, it got on my nerves now... Does anyone have a suggestion on what to do?