"unver":10oy2en6" said:Hello If you add your project, we will review it. Unver ÖZCAN
There are faulty raft slab formations in your project. It is given as an error message when you check the geometry. When the faulty mat foundations are deleted, the analysis will be done correctly. Good work"gunay.17":1u4zrubq" said:I am a 4th year civil engineering student. For my research project I will draw a project in different programs and compare the quantity. I drew it in idecad but I am getting the error "Cannot create network for RD01". .
The slab sitting on the fill is not calculated. Therefore, it does not need to be defined as a slab. 2D drawing possibilities are used for its representation in drawings."gunay.17":w89mlhjx" said:I have one more question, I would appreciate it if you could help me. The part of the project defined as the 1st basement floor will be the filling and the slab floor on it will be steel mesh. If this is the case, there is no need for the beams on the basement floor. How can I define it? ?
Thank you"Levent Özpak":yws1sy4l" said:The tile sitting on the infill is not calculated. Therefore, it does not need to be defined as flooring. 2D drawing possibilities are used for its representation in the drawings."gunay.17":yws1sy4l" said:I have one more question, I would be glad if you could help me. The part of the project, defined as the 1st basement floor, will be filled and the slab on it will be steel mesh. In this way, there is no need for beams in the basement. How do I define this?