I am getting a warning of insufficient slab thickness

Gokhan30

New Member
Hello. I started a project. A village house project. In the project, I get the problem of insufficient slab thickness on 2 floors for a slab. My floor is 12. my beams are 25/50, I increased the floor to 15. The same problem still persisted. I made the floor 17. This time I got the problem that the beam cannot be smaller than 3 times. I made my beam 60. I tried again by making the slab 20 cm. But I still get the same error of slab thickness insufficient. I made the slab 21 and this time the beam was insufficient again. Isn't it possible for me to solve this tile as 12 as in other tiles? The place where the slab is already has a size of 5.5 x 4.5. Do you think increasing the flooring is the right solution for a 24 square meter place? I would be glad if you help
 
Re: Insufficient slab thickness problem Thank you very much in advance. Since it is my first project, I think I am also lacking in technical knowledge.
 
Re: The problem of insufficient slab thickness Hello, Your 2 slabs in your project do not save the slab thickness from TS 500 article 11.4.2. In this calculation made according to the opening, you need to make the slab thickness at least 14 cm. If you check the geometry in the program before the analysis, you can see this situation. When you analyze in this way, we can see that a minimum of 14 cm flooring should be selected in the report. In case you check the report and geometry after making both tiles 14 cm; There is no problem if you make 2 tiles that do not save 14 cm.
 
Re: Insufficient slab thickness problem I'm sorry to bother you, but now I'm getting a cutting safety error in the column-beam junction. I looked at the forums a bit, they said increase bj, but I can't play with my beam like this. They said increase the concrete class. Since it is a project, it seems like this is not possible. What kind of solution should I follow? Can you help me please?
 
Re: Insufficient slab thickness problem Hello. My suggestion is attached. Check the direction of the stairs. Unver ÖZCAN
 
Re: The problem of insufficient slab thickness Thank you very much, it is just a situation that will be costly in terms of molds. New molds will be cut, but they have met all the conditions. Isn't it possible for us to analyze these columns in 30x60 size?
 
Back
Top