I'm getting the elevator shaft insufficient reinforcement error

hatipoğlu

New Member
Insufficient reinforcement on the curtain in the ELEVATOR WELL. and I get the error of negative ground safety and insufficient reinforcement in the raft foundation of the well. can you help me. No matter how much I increased the sections, there was no solution.
 
Make a gap analysis at the place where the elevator bucket is and draw the elevator foundation there with two-dimensional possibilities.
 
"hatipoğlu":3442sf6g" said:
I get the error of insufficient reinforcement in the curtain in the ELEVATOR WELL and I get the error that the ground safety is negative and the reinforcement is insufficient on the raft foundation of the well. Can you help. No matter how much I increased the cross-sections, there was no solution.
Hello, You entered it as a polygon column. It would be appropriate to enter it as a panel object and model it as a shell (Because the polygon column is modeled as a bar, beams, panels, slab edges cannot be entered between its arms and cannot be equipped like a curtain) -Modelling the lift shaft without leveling the curtains and as a flat raft foundation, We recommend that you give the elevator pit detail separately
You do not have permission to view link Log in or register now.
-Analysis It is recommended to select the superstructure interactive solution option in the /Foundation-Soil Tab. (It is required for c and d group floors in TDY 2007. After arranging the project according to the above suggestions, then attach the file if the problem is not resolved. Let's check that there is no problem with data entry. Good work
 