Hello, I have some questions about retrofitting, maybe other than idecad, but if you answer, the question marks in my mind will be gone: 1. How can we determine the ground coefficient in the Retrofit Project? If the project is old, is the ground class determined by opening an inspection pit in the existing building? 2. While drawing a Retrofit Project, shall I enter the status of the existing building and make a performance analysis and then prepare a retrofit project? 3. While drawing the Reinforcement Project, should I first have the analysis done and then arrange the reinforcement of the existing building because as far as I know, we cannot assign reinforcements without first analysis in idecadte. I may be wrong, I would be very grateful if you could help me about these issues, thank you in advance.
 
Re: REINFORCEMENT SUBJECT
"Mert Kaymaz":2oxcgoye" said:
Hi, I have some questions about retrofitting, maybe other than idecad, but if you answer, my questions will be gone: 1. How can we determine the floor coefficient in the Retrofit Project? If the project is old, should the ground class be determined by opening an inspection pit in the existing building? 2. While drawing the retrofit project, shall I enter the status of the existing building and make a performance analysis and then prepare a reinforcement project? 3. While drawing the retrofit project, shall I first have the analysis done and then arrange the reinforcement of the existing building because As far as I know, idecadte cannot assign equipment without first analysis. I may be wrong, I may be wrong, I would be very grateful if you could help me about these issues, thank you in advance
There is a " User's Guide (pdf) for v10 Retrofit possibilities " in the link below. .idecadsupport.com/forum/viewtopic.php?f=12&t=8562]viewtopic.php?f=12&t=8562[/url]
 
Re: EMPOWERMENT SUBJECT Mr. Şahin, First of all, thank you for your help. But the questions that come to my mind are not exactly available here. 1. In order to enter the ground coefficient in the retrofit project, should I open an inspection pit and have the building tested, or is it sufficient to get the ground data from afad's program? By the way, the project of the building is old, so the floor coefficient cannot be found.
 
Re: STRENGTHENING SUBJECT If you do not have information about the ground for an existing building, you must first conduct a ground survey, then find the acceleration values according to the ground class and the coordinates of the building. As a result of the ground survey, you enter the bearing power and bearing coefficient of the zen in the ground section of the analysis periods.
 