S serhatctin New Member Apr 8, 2021 #1 AS AN EXAMPLE, I WANT TO INTERVENE IN THE STOCK HOOK THAT PROMOTES 14 CM ON THE BEAM WITH 10 CM IN TERMS OF WORKMANSHIP, WHERE CAN I DO THAT?
AS AN EXAMPLE, I WANT TO INTERVENE IN THE STOCK HOOK THAT PROMOTES 14 CM ON THE BEAM WITH 10 CM IN TERMS OF WORKMANSHIP, WHERE CAN I DO THAT?
L Levent Özpak New Member Apr 8, 2021 #2 Re: INTERVENTION WITH REINFORCEMENT LENGTH Stirrup and cross tie details are prepared automatically according to the conditions required in TBDY 2018 article 7.2.8 and figure 7.1. It is not optional.
Re: INTERVENTION WITH REINFORCEMENT LENGTH Stirrup and cross tie details are prepared automatically according to the conditions required in TBDY 2018 article 7.2.8 and figure 7.1. It is not optional.