omeragar04
New Member
Have a nice day. I am making a 12-floor hollow floor project. The contractor said that the filler material will be 'B1 Class White Styrofoam Foam'. What should I do to make this affect the project? Do I need to reduce the fixed load? How much should I reduce if necessary? I get a constant load of 0.2 t/m2.