Hollow material

omeragar04

New Member
Have a nice day. I am making a 12-floor hollow floor project. The contractor said that the filler material will be 'B1 Class White Styrofoam Foam'. What should I do to make this affect the project? Do I need to reduce the fixed load? How much should I reduce if necessary? I get a constant load of 0.2 t/m2.
 
"omeragar04":25lzma6z" said:
Good afternoon. I am working on a 12-storey hollow floor project. The contractor said that the filler material will be 'B1 Class White Styrofoam Foam'. What should I do to effect this on the project. Should I reduce the fixed load? If necessary, how much? I take the fixed load by 0.2 t/m2.
Hello, The filling weight is not included in the ready-made coating loads used in the program. You need to add it to the coating load according to the material you will use. If styrofoam will be used, do not add an additional load to the coating load you choose.
 
Back
Top