Hollow Building Tipping Calculation

23hasankoc

New Member
Take it easy. Even though the Hollow Floor System is a complete curtain, I couldn't provide the overturning moment. Could you help me? My project is attached.
 
The structural system of your project is very irregular, even if you can make all the elements as a shear in the irregular carrier systems, it may not be possible to carry all the overturning moments only by the shears. Beams also receive moment from the system. For this reason, it is necessary to design the structure in such a way that it consists of continuous frames as much as possible, without protruding as much as possible. There are 64 errors in your project as well as not meeting the tipping moment condition. You should review your model.
 
Back
Top