High Building

isbandam

New Member
Since I haven't solved a tall structure like in the attached project, I'm waiting for friends' comments on data entry and results. How should I model the elevator pit? Note: I couldn't solve the ladder with the structure even though I edited the Support conditions (editing was reversed in the project). The landings that I created with the slab edge are my problem. I seek help from those who have time. plugin: http://rapidshare.com/files/2964305725/A-BLOK%20STAT%C4%B0K.ide7
 
Re: HIGH STRUCTURE
"isbandam":amrbjp6k" said:
Note: I couldn't solve the ladder with the structure even though I edited the Support conditions
Hello, It seems that the 1st arm of the two-armed ladder used in the project is not connected to the intermediate landing There is no problem in the connections of the 3-arm ladder.When the default ladder in the ladder library for the two-arm ladder is applied in the project by changing its dimensions, and the ladder supports are arranged according to the solution conditions together with the structure, and the analysis is made according to the semi-rigid diaphragm option, the ladder and the structure are solved together correctly. .
You do not have permission to view link Log in or register now.
Note: Linear and point slab load is effective on slab slab Linear load is defined on rib slab and beam in the project. load does not affect the rib teeth. Instead, the pavement or live load of the floor can be increased.
 