There was also ground + 2 floors in a project that was a permanent foundation. 1 more floor was added, I analyzed it as ground + 3 floors. In the building inspection report, I want to check whether the foundation and flooring reinforcements are the same as the project, the report says there is nothing about the foundation. When I look at the report, there are column and beam reinforcements. It says that only c25 concrete class is used for the foundation. there is no other information. I looked at the projects I've done before and there is no information about it. can you please help me i added the project i would be very happy if you get a feedback take it easy everyone...