Hello there. When I do a retaining wall analysis, I take H=6 m as an example. In the report, I get a result of 1.42 m as the moment arm for the static active lateral ground pressure force value (Pas). Whereas H/3 = 2 . Respects...
 
Hello, The 2 meters moment arm value you wrote is for cohesionless soils. If you set the cohesion value to zero in the retaining wall information, you can see the moment arm for 2 meters. In cohesive soils, you must first find the point where the stress is zero from the top of the retaining wall. (Zo) Zo = (2*c / gamma) * (tan45+fi/2) Retaining wall information: c=0.9 gamma=1.80 fi=30 H=6 Zo= (2*) 0.9/1.8)*(tan60) = 1.732. The distance of the zero point of the stress from the lower end of the support = H-Zo = 6- 1.732 = 4.267 m. Moment arm = 4.267/3= 1.422. (same as the program) Source: Mustafa Duzgun- Retaining Walls Static and Dynamic Analysis book
 
Is it possible to draw trestle reinforcement on the base of the retaining wall and cross-ties on the console curtain?
 
"Ufukbey":1i6zcxs5" said:
Is it possible to draw trestle reinforcement on the basis of the retaining wall and cross-ties on the console curtain?
No. I hope these details will be added when the new regulation is updated.
 
"MaFiAMaX":244y2sfj" said:
Hi, I would like to introduce reinforcement locking feature in the new version.
Is it possible to solve the retaining structure in the current version 10.14? Has there been an update on this? Thank you
 
Hi According to TBDY2018 in ideCAD10.14 version you can't fix retaining wall. An update is coming in ideCAD10.15 version. Unver ÖZCAN
 
Hello, is there an update date for 10.15? There are works that need to be licensed due to the parking regulation, with retaining walls.
 