Ground floor and basement

mehmet2015

New Member
HOW CAN I ENTER THE DEFINITIONS OF ALL THE DEFINITIONS (COLUMN BEAM FLOORING ETC.) TO BE MADE ON THE GROUND FLOOR IN CREATING THE BASEMENT? I WANTED TO ADD MY FILE BUT I CAN'T UPLOAD DUE TO THE LARGE SIZE.
 
I MADE CURTAIN ENTRANCE TO WATER BASMAN BUT I CANNOT ENTER THE FLOOR ITEM, FOR EXAMPLE, WHEN I ENTER -280 AS DENIM, THE FLOOR GIVES AN INCORRECT FLOOR LEVEL WARNING. ALSO THE GROUND FLOOR CEILING HAS BEAMS AND FLOORING IS ATTACHED TO THE LIMITED AREAS OF THE BEAMERS. +1.20 HOW CAN I DEFINE FLOORING THERE, BECAUSE THERE IS NO BEAM ON THE BASEMENT LEVEL?
 
"mehmet2015":2d78bhjy" said:
I MADE CURTAIN ENTRANCE TO SU BASMAN LEVEL BUT I CAN'T ENTRY TO THE FLOOR, FOR EXAMPLE, IT GIVES A FAULT FLOOR LEVEL WARNING WHEN I ENTER -280 AS A LEATHER. HOW DO I DEFINE FLOORING BECAUSE THERE IS NO BEAM IN THE LEVEL?
Did you check the link I gave you exactly? You must define it as a separate floor.
 
Can we fill in the sub-basement and define flooring on it? In the architectural project, there is a ground floor slab at the (+1.20) level at the end of the floodplain, which I could not identify. Also, I'm currently giving vertical continuity error in my columns, I think I would be glad if you could help me to fix it because of the basement curtain. Good work.
 
You do not need to create flooring inside the Basman curtains. The inside of the flooding is filled with filling material and leveling concrete is poured on it. It has nothing to do with the static system.
 
Back
Top