hello, can you help with this ground bearing capacity? Soil safety stress = 13 tf / m2 value is given in the ground survey reports, while revising the project before 2019, will we enter the soil bearing capacity value = 13 * 2.5 = 32.5 tf / m2 at ide 10, is it true? Is the formulation always like this, will it change, thank you