Hello, You need to define the continuous foundations under the curtains using the nodes of the curtains, otherwise connection problems will occur. I fixed two bases. On the bulkheads, the horizontal body reinforcements were locked but not sufficient. When the reinforcements are recalculated, the cutting safety problem does not occur. For the soil safety stress problem in the foundations, the cross-sections can be increased or the raft foundation design option can be tried.